QUALITY & INSPECTION

Inspection Evidence, Measured on the Parts We Ship

Dimensional accuracy and inner bore finish decide how long a thermal spray component survives in production. We measure both in-house, record the results per batch, and release parts only after they pass.

Coordinate measuring machine inspecting a machined thermal spray nozzle
≤ 0.01 mm Dimensional accuracy on critical geometry
Ra ≤ 0.1 μm Inner bore roughness after finishing
INSPECTION EQUIPMENT

Four Measurement Routes Behind Every Batch

Profile features, full three-dimensional geometry, fast shop-floor checks and surface finish each go to a dedicated station rather than one generic end-of-line glance.

Vision measurement system displaying the magnified profile of a machined component
NON-CONTACT

2D Vision Measurement

Optical profile measurement for edge form, tapers, step lengths and small features that are awkward to reach with a contact probe.

Coordinate measuring machine probe touching a machined part on the granite table
CONTACT, 3D

CMM (3D) Verification

Coordinate measurement of bore position, concentricity and the spatial relationship between faces, checked against the released drawing.

Bench-top instant measurement device used for a fast dimensional check during production
SHOP FLOOR

Instant / Quick Measurement

Flash measurement at the machine gives immediate feedback during machining, so a drift is corrected while the part is still in the fixture.

Surface roughness tester tracing the internal surface of a finished bore
SURFACE FINISH

Surface Roughness Testing

Roughness measurement of internal and external surfaces, because a coarse bore surface collects powder and shortens service life.

KEY INSPECTION ITEMS

Measured Against the Drawing, Not Against an Impression

Every critical feature on a machined thermal spray component has a nominal, a tolerance and a measurement method. These are the items we control and record.

  • Bore diameter, roundness and straightness
  • Taper and seat geometry where the part mates
  • Step lengths, shoulders and thread form
  • Inner bore surface roughness after finishing
  • Burrs, tool marks and internal cleanliness
RELEASED VALUES
≤ 0.01 mm Dimensional accuracy

Tolerance held on the critical geometry of the parts we machine.

Ra ≤ 0.1 μm Inner bore roughness

Finish on the internal surfaces that guide powder and gas.

IN-PROCESS INSPECTION

Checks That Happen While the Part Is Still in the Machine

Finding a drift after the part is finished is too late. In-process checks sit at the points where a setup change or a tool change can move a dimension.

01

First-Piece Check

The first part after a setup or tool change is measured in full before the run continues.

02

Dimensional Check During the Run

Scheduled checks across the batch confirm the process has not drifted away from nominal.

03

Finish Monitoring

Bore finish is measured during finishing rather than assumed from the tool path.

04

Cleaning Before Release

Parts are deburred and cleaned before they move on to final inspection.

Finished component under final inspection on a measuring bench beside its dimensional record
FINAL INSPECTION & RELEASE

Nothing Leaves the Bay Without a Release Decision

Final inspection combines the record kept during the run with a fresh measurement of the released features on the finished part.

  • Critical dimensions re-measured on the finished part, not only in process
  • Bore roughness verified against the released value
  • Visual check for burrs, handling marks and internal contamination
  • Inspection record completed and attached to the batch

A part that does not pass is not packed and not shipped.

NON-CONFORMING PARTS

What Happens When a Part Fails Inspection

A failed measurement is information about the process. Each non-conforming part is identified, evaluated and closed out before the run resumes.

01

Identify & Segregate

The part is marked, set aside from conforming production and recorded together with the feature that failed.

02

Evaluate & Decide

Re-measurement confirms the result; the part is then reworked, replaced or scrapped by decision, never by default.

03

Correct & Verify

The cause is corrected at the machine and the next part is measured to confirm the correction held.

TESTING & RELEASE CRITERIA

The Table That Decides Release

Each row names a check and the condition that has to be met before a batch is released for packing. Measured values are quoted against the released drawing.

The two released values are the figures we publish. The remaining rows are verified against the drawing and closed out in the batch record.

Dimensional accuracy
≤ 0.01 mm
Inner bore roughness
Ra ≤ 0.1 μm
Key dimensions
Per drawing
Bore geometry
Measured
Thread & seat fit
Gauge check
Surface condition
Visual
Batch record
Completed
Release decision
Sign-off
INSPECTION PHOTOGRAPHY

Where the Measurements Are Taken

Measurement stations rather than studio shots: the instrument, the setup and the record that accompany a released batch.

Inspection bench with gauges and a dimensional record sheet beside finished components
Inspection bench: gauges, micrometers and the batch record used for the final dimensional release of each part.
Roughness trace displayed on the measuring instrument after tracing an internal bore
Roughness trace: the internal surface profile recorded for the batch and compared with the released bore roughness value.
INSPECTION RECORDS

Ask for the Inspection Record With Your Quotation

Send the drawing or part number you need matched. We will confirm the critical features, the measurement method behind them, and the release criteria that will apply to your batch.